Flagship Project · Under Development · Afghanistan

Afghanistan
Cement Plant

A landmark EPC megaproject — partnering with Sinoma CNBM, the world's largest cement equipment manufacturer — to build Afghanistan's most modern industrial cement production facility at 2,500 tonnes per day.

Project Overview
Capacity 2,500 TPD
Contract Type Full EPC Turnkey
Technology Partner Sinoma CNBM
Location Afghanistan
Status In Development
Overall Progress 75%
2,500
Tonnes Per Day
Clinker Capacity
6
Group Companies
Contributing
1,200+
Jobs Created
Local & Skilled
50K MT
Silo Storage
Capacity
CNBM
Sinoma — World #1
Cement Tech Partner
Cement storage silo cluster
Storage Silo Cluster — 50,000 MT Capacity
Rotary kiln clinker production
Rotary Kiln — Clinker Production
Plant layout blueprint
Site Layout — EPC Blueprint
The Vision

Rebuilding a Nation
One Tonne at a Time

Afghanistan imports nearly all of its cement — this project changes that permanently.

The Afghanistan Cement Plant is the centrepiece of Indus Holdings' industrial strategy. Designed as a full EPC (Engineering, Procurement, and Construction) turnkey project in partnership with Sinoma CNBM — the world's largest cement plant engineering and equipment manufacturing group — the facility will produce 2,500 tonnes of clinker per day using the latest dry-process rotary kiln technology.

This is not just a manufacturing plant — it is a catalyst for Afghanistan's reconstruction, generating over 1,200 direct and indirect jobs, reducing dependence on costly cement imports, and anchoring an entire industrial zone in the region.

🏭
Plant Type
Dry Process Rotary Kiln
⚙️
Daily Output
2,500 TPD Clinker
🌍
Location
Afghanistan (Site TBC)
🤝
EPC Partner
Sinoma CNBM International
💼
Contract Type
Full Turnkey EPC
👥
Jobs Created
1,200+ Direct & Indirect
🏗️
Storage
50,000 MT Silo Capacity
📅
Status
Advanced Planning & Development
Technology Partner

Powered by the
World's Best

Sinoma CNBM (China National Building Material Group) is the world's largest cement equipment manufacturer and EPC contractor — having delivered over 300 cement plants across 80+ countries. Their partnership with Indus Holdings brings cutting-edge Chinese industrial engineering to Afghanistan's emerging economy.

The partnership covers the complete plant: engineering design, equipment supply, installation supervision, commissioning, and knowledge transfer to local staff. The result is a facility built to international standards with world-class operational efficiency from day one.

🌍 80+ Countries
🏭 300+ Plants Built
⭐ World #1 Cement EPC
🔬 ISO Certified Tech
🤝 Partnership Scope
📐
Engineering & Design
Full plant engineering, civil & structural design
⚙️
Equipment Supply
Rotary kiln, preheater, mills, silos & all auxiliaries
🏗️
Construction Supervision
On-site Chinese engineers + local workforce
🚀
Commissioning & Handover
Full operational testing & staff training
📚
Technology Transfer
Local team certification & operations manual
Delivery Method

Full EPC Turnkey
Framework

Engineering, Procurement and Construction — three integrated phases delivered end-to-end under one unified contract for maximum efficiency and accountability.

E
📐

Engineering

Design, planning & technical specification

1

Process Design

Full process flow diagram, mass & heat balance calculations, equipment sizing for 2,500 TPD output.

2

Civil & Structural

Foundation design, structural steel, building layouts adapted for Afghan seismic and soil conditions.

3

Electrical & Automation

Full PLC/DCS control system design, power supply engineering, and instrumentation specification.

P
📦

Procurement

Global sourcing & supply chain management

1

Core Equipment

Rotary kiln, preheater tower, raw mill, coal mill, cement mill and all major process equipment from Sinoma.

2

Auxiliary Systems

Dust collectors, fans, conveyors, silos, packing plant, laboratory equipment via Monarch Impex.

3

Local Materials

Construction materials, civil supplies, and consumables sourced locally to maximise Afghan economic benefit.

C
🏗️

Construction

Site execution, installation & commissioning

1

Civil Works

Site preparation, foundations, concrete structures, roads, drainage and plant infrastructure.

2

Mechanical Erection

Equipment installation, piping, steel structures, kiln erection and all mechanical systems assembly.

3

Commissioning

Cold and hot commissioning, performance testing to rated capacity, staff training and formal handover.

The Indus Group at Work

6 Companies.
One Megaproject.

The Afghanistan Cement Plant is where the Indus Holdings synergy model delivers its ultimate proof — six group companies each providing a critical service.

💼
OVB Management & Consulting
Finance & Investment

Leads financial structuring, investor relations, M&A advisory, and cross-border investment strategy for the entire project — the financial brain of the operation.

TQMS Consulting
Quality Management

Provides ISO-aligned quality management systems, process auditing, construction quality oversight, and operational readiness certification throughout the build.

📦
Monarch Impex
Procurement & Supply

Manages international equipment procurement, import/export operations, customs clearance, and the complete supply chain for construction materials and plant equipment.

📡
Monarch VT
Fleet & Logistics

Deploys GPS fleet management and telematics to track all construction vehicles, equipment, and material logistics — providing real-time visibility across the project site.

🛡️
AMAN Security
Site Security

Provides comprehensive site security — manned guarding, access control, perimeter protection, VIP escort for senior engineers and executives visiting the project site.

🏢
AMAN Facilities
Camp & Site Management

Manages the construction camp — worker accommodation, catering, hygiene, waste management, and all camp services for the 1,200+ workforce on site.

Why It Matters

Nation-Building Impact

Beyond tonnes and profit — this project reshapes Afghanistan's industrial landscape, reduces import dependency, and plants the seed of a self-sufficient construction economy.

👷
1,200+
Direct & Indirect
Jobs Created
🏭
2,500
Tonnes Per Day
Clinker Capacity
📉
40%
Reduction in Local
Cement Import Cost
🎓
300+
Afghan Engineers
& Technicians Trained
🌍
$200M+
Estimated Annual
Economic Impact
"

This cement plant is not just an investment — it is our commitment to Afghanistan's future. Every tonne produced here replaces an import, creates a job, and builds a future for the next generation.

— Mubashar Aftab Sheikh, Chairman, Indus Holdings

Chairman Mubashar Aftab Sheikh
Project Milestones

From Vision
to Production

A structured 5-phase EPC roadmap — from concept to full commercial operation.

Phase 1

Concept & Feasibility

Market analysis, demand forecasting, site surveys, limestone resource assessment, preliminary financial modelling, and executive approval by Indus Holdings board.

Phase 2

Partnership & Contract

Formal engagement with Sinoma CNBM International, technical scope definition, EPC contract negotiation, financial structuring via OVB Consulting, and contract signing.

Phase 3 — Current

Engineering & Permitting

Detailed engineering by Sinoma CNBM, environmental impact assessment, local permitting, equipment procurement orders placed, site preparation initiated.

In Progress — 2025/26
Phase 4

Construction & Erection

Civil foundation works, equipment erection, piping and electrical installation, kiln assembly, silo construction, and full mechanical completion of the plant.

Phase 5

Commissioning & Full Production

Cold and hot commissioning runs, performance guarantee testing to achieve 2,500 TPD rated capacity, operator training completion, and formal handover to operations team.